All Zero Codes

Zero Code Sales Description Chargeable
AIR BER SOUND
Air Tightness Test Dwelling Air Tightness Test to ATTMA TLS1 with PDF Report
As Built SAP As Built SAP
As Design SAP As Design SAP calculation, U-values calculations an accredited construction details
EPC EPC
Air Tightness Test Commercial Air Tightness Test to ATTMA TLS2 with PDF Report
Sound Test Set of 2 Sound Test Party Wall
Sound Test Set of 6 Sound Test Set of 6
Air Test Apartments Air Tightness Test to ATTMA TLS1 with PDF Report
AIR TEST, SAP AIR TEST, SAP
THERMAL IMAGE SURVEY THERMAL IMAGE SURVEY
U-VALUE CALCULATIONS U-VALUE CALCULATIONS
EPC RE-LODGEMENT EPC RE-LODGEMENT
ISBEM CALCULATION AND EPC ISBEM CALCULATION AND EPC
Trade off Calculations and U-values Trade off Calculations and U-values
Air Test, SAP Air Tightness Test with PDF Cert, As Built SAP Caculations, EPC
Air Tightness of Dwelling (ROI) Air Tightness Test In Compliance with I.S EN 9972:2015 and PDF Report
BER Building Energy Rating
Temp sealing of vents Temp sealing of vents By Energy First Services for the test
Retest sound test Retest sound test
iSbem Calculation iSbem Calculation
Pre-Test Site Inspection Pre-Test Site Inspection
Pre-completion Air Tightness Test Pre-completion Air Tightness Test
Re-Lodgement Re-Lodgement of EPC and amendment to reports
Reverberation calculation Reverberation calculation
Air Tightness Test Commercial (ROI) Air Tightness Test and detailed Test Report including results in accordance with the required EN 9972:2015 an ISO:17025 test methodology.Price includes: Detailed Calculation of Envelope Area in accordance with ATTMA TS2Detailed Test Report including
Sample Air Tightness Test 1 sample air tightness test per site with detailed report.
Air Test Air Test
Pre-Test Site Inspection Pre-Test Site Inspection (recommended to achieve optimum test results during the official test). Conduct a pre-test inspection of the building, compiling a list of any minor defects or omissions to be rectified by the client before the official test. This
Additional Site Visits Additional Site Visits - as requested by client to assess and discuss on-going issues on-site with construction
Air Leakage Audit (Smoke Test) Air Leakage Audit (Smoke Test). A smoke based air leakage audit will be conducted only if the building fails the airtightness test. This work will be carried out on the same day as the airtightness test.
Optional Services Optional Services
Design BER Design BER
Sound Test 1 Sound Test
Cancelation of Test Cancelation of Test on site due to noise
Internal Floor Internal Floor
Preliminary Site Inspection Preliminary Site Inspection, Review of Architects Drawings
Out of hours charge Out of hours charge
Calibration Calibration
Testing 1 Please Ignore
Ventilation Validation Ventilation Validation
Reverberation Test Reverberation Test
katana katana
katana katana
Total 43