Air Tightness Test Dwelling
|
Air Tightness Test to ATTMA TLS1 with PDF Report
|
|
|
|
As Built SAP
|
As Built SAP
|
|
|
|
As Design SAP
|
As Design SAP calculation, U-values calculations an accredited construction details
|
|
|
|
EPC
|
EPC
|
|
|
|
Air Tightness Test Commercial
|
Air Tightness Test to ATTMA TLS2 with PDF Report
|
|
|
|
Sound Test Set of 2
|
Sound Test Party Wall
|
|
|
|
Sound Test Set of 6
|
Sound Test Set of 6
|
|
|
|
Air Test Apartments
|
Air Tightness Test to ATTMA TLS1 with PDF Report
|
|
|
|
AIR TEST, SAP
|
AIR TEST, SAP
|
|
|
|
THERMAL IMAGE SURVEY
|
THERMAL IMAGE SURVEY
|
|
|
|
U-VALUE CALCULATIONS
|
U-VALUE CALCULATIONS
|
|
|
|
EPC RE-LODGEMENT
|
EPC RE-LODGEMENT
|
|
|
|
ISBEM CALCULATION AND EPC
|
ISBEM CALCULATION AND EPC
|
|
|
|
Trade off Calculations and U-values
|
Trade off Calculations and U-values
|
|
|
|
Air Test, SAP
|
Air Tightness Test with PDF Cert, As Built SAP Caculations, EPC
|
|
|
|
Air Tightness of Dwelling (ROI)
|
Air Tightness Test In Compliance with I.S EN 9972:2015 and PDF Report
|
|
|
|
BER
|
Building Energy Rating
|
|
|
|
Temp sealing of vents
|
Temp sealing of vents By Energy First Services for the test
|
|
|
|
Retest sound test
|
Retest sound test
|
|
|
|
iSbem Calculation
|
iSbem Calculation
|
|
|
|
Pre-Test Site Inspection
|
Pre-Test Site Inspection
|
|
|
|
Pre-completion Air Tightness Test
|
Pre-completion Air Tightness Test
|
|
|
|
Re-Lodgement
|
Re-Lodgement of EPC and amendment to reports
|
|
|
|
Reverberation calculation
|
Reverberation calculation
|
|
|
|
Air Tightness Test Commercial (ROI)
|
Air Tightness Test and detailed Test Report including results in accordance with the required EN 9972:2015 an ISO:17025 test methodology.Price includes: Detailed Calculation of Envelope Area in accordance with ATTMA TS2Detailed Test Report including
|
|
|
|
Sample Air Tightness Test
|
1 sample air tightness test per site with detailed report.
|
|
|
|
Air Test
|
Air Test
|
|
|
|
Pre-Test Site Inspection
|
Pre-Test Site Inspection (recommended to achieve optimum test results during the official test). Conduct a pre-test inspection of the building, compiling a list of any minor defects or omissions to be rectified by the client before the official test. This
|
|
|
|
Additional Site Visits
|
Additional Site Visits - as requested by client to assess and discuss on-going issues on-site with construction
|
|
|
|
Air Leakage Audit (Smoke Test)
|
Air Leakage Audit (Smoke Test). A smoke based air leakage audit will be conducted only if the building fails the airtightness test. This work will be carried out on the same day as the airtightness test.
|
|
|
|
Optional Services
|
Optional Services
|
|
|
|
Design BER
|
Design BER
|
|
|
|
Sound Test
|
1 Sound Test
|
|
|
|
Cancelation of Test
|
Cancelation of Test on site due to noise
|
|
|
|
Internal Floor
|
Internal Floor
|
|
|
|
Preliminary Site Inspection
|
Preliminary Site Inspection, Review of Architects Drawings
|
|
|
|
Out of hours charge
|
Out of hours charge
|
|
|
|
Calibration
|
Calibration
|
|
|
|
Testing 1
|
Please Ignore
|
|
|
|
Ventilation Validation
|
Ventilation Validation
|
|
|
|
Reverberation Test
|
Reverberation Test
|
|
|
|
katana
|
katana
|
|
|
|
katana
|
katana
|
|
|
|