Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
23/06/2025 10:30
|
3.064618
Failed
|
0.9992
Passed
|
0.499035096
Passed
|
-10.43 - 0.95
Failed
|
Failed
|
Listoke Pines Ballymakenny Drogheda
|
Please enter an Existing Valid Job Number to Reallocate this Result record