| Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
|
26/08/2025 10:05
|
5.123838
Failed
|
0.99667
Passed
|
0.613749129
Passed
|
-20.35 - 20.41
Failed
|
Failed
|
Potters Field Close Ardee
|
Please enter an Existing Valid Job Number to Reallocate this Result record