Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
01/10/2025 12:25 3.481734  Failed 0.9978  Passed 0.665938088  Passed -20.32 - 10.75  Failed Failed 46 Listoke Drive, Ballymakenny

Please enter an Existing Valid Job Number to Reallocate this Result record