| Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
|
21/10/2025 14:43
|
3.903817
Passed
|
0.99679
Passed
|
0.501145933
Passed
|
-20.90 - 20.44
Failed
|
Passed
|
Unit 11- 020 Airport Trade Park
|
Please enter an Existing Valid Job Number to Reallocate this Result record