Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
27/10/2025 12:57 3.944108  Passed 0.99792  Passed 0.680597441  Passed -20.69 - 20.59  Failed Passed Unit 7- 020 Airport Trade Park

Please enter an Existing Valid Job Number to Reallocate this Result record