| Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
|
27/10/2025 12:57
|
3.944108
Passed
|
0.99792
Passed
|
0.680597441
Passed
|
-20.69 - 20.59
Failed
|
Passed
|
Unit 7- 020 Airport Trade Park
|
Please enter an Existing Valid Job Number to Reallocate this Result record