Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
06/11/2025 12:48 8.48398  Failed 0.99422  Passed 0.747215872  Passed -30.46 - 30.63  Failed Failed 30 Hawthorn road, Bray Co. Wicklow

Please enter an Existing Valid Job Number to Reallocate this Result record