Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
09/02/2026 11:43 1.826641  Passed 0.99627  Passed 0.454313276  Failed -10.80 - 20.07  Failed Failed Apartment 6 Block A Tully Way Cherrywood

Please enter an Existing Valid Job Number to Reallocate this Result record