Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
10/02/2026 11:28 2.796004  Passed 0.9604  Failed 0.578751503  Passed -30.25 - 130.19  Failed Failed Apartment 24 Block B Tully Way Cherrywood

Please enter an Existing Valid Job Number to Reallocate this Result record