Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
28/11/2022 08:26 3.13144  Failed 0.99858  Passed 0.616995681  Passed -10.25 - 10.52  Failed Failed 4 Listoke Elms, Ballymakenny Road, Drogheda

Please enter an Existing Valid Job Number to Reallocate this Result record