Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
29/11/2022 08:54 2.99127  Passed 0.99965  Passed 0.657897257  Passed -10.25 - 10.52  Failed Passed 4 Listoke Elms, Ballymakenny Road, Drogheda

Please enter an Existing Valid Job Number to Reallocate this Result record