Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
01/12/2022 12:41 2.97101  Passed 0.99562  Passed 0.626769498  Passed -20.26 - 20.21  Failed Passed 6 Listoke Elms, Ballymakenny Road, Drogheda

Please enter an Existing Valid Job Number to Reallocate this Result record