Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
04/01/2023 15:37 2.94195  Passed 0.99637  Passed 0.547660479  Passed -10.40 - 20.74  Failed Passed 44 Listoke Elms, Ballymakenny Road, Drogheda

Please enter an Existing Valid Job Number to Reallocate this Result record