Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
09/01/2023 15:50
|
2.7569
Passed
|
0.99944
Passed
|
0.639763301
Passed
|
-140.69 - 270.68
Failed
|
Passed
|
29 Woodstock Way Townparks, Athy, Co Kildare
|
Please enter an Existing Valid Job Number to Reallocate this Result record