Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
28/01/2023 11:14 0.926384  Passed 0.99899  Passed 0.577894508  Passed -10.55 - 20.27  Failed Passed 005 Input Uint 1 Dublin Quantum Distribution Park Kilshane Cross Co,Dublin D11H6EX

Please enter an Existing Valid Job Number to Reallocate this Result record