Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
02/03/2023 14:37
|
2.906677
Passed
|
0.9991
Passed
|
0.650808979
Passed
|
-10.58 - 20.08
Failed
|
Passed
|
17 Ellwood Ballymakenny Rd Drogheda
|
Please enter an Existing Valid Job Number to Reallocate this Result record