Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
14/06/2023 09:27 4.166575  Failed 0.99648  Passed 0.795120884  Passed -20.30 - 10.40  Failed Failed Minnow Place Churchfields Dublin

Please enter an Existing Valid Job Number to Reallocate this Result record