Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
02/08/2023 12:33 3.258274  Failed 0.99383  Passed 0.730712805  Passed -40.97 - 40.76  Failed Failed Minnow Place Churchfields Dublin

Please enter an Existing Valid Job Number to Reallocate this Result record