Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
02/08/2023 12:40 3.075965  Failed 0.99631  Passed 0.709370862  Passed -40.47 - 20.51  Failed Failed Minnow Place Churchfields Dublin

Please enter an Existing Valid Job Number to Reallocate this Result record