Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
08/08/2023 10:22
|
2.810453
Failed
|
0.99818
Passed
|
0.57945663
Passed
|
-10.31 - 10.48
Failed
|
Failed
|
2014_ST. Pauls PP, Monasterevin, Kildare_OHMG
|
Please enter an Existing Valid Job Number to Reallocate this Result record