Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
18/09/2023 11:59
|
1.529118
Passed
|
0.98929
Passed
|
0.601360586
Passed
|
-20.73 - 50.33
Failed
|
Passed
|
The Keenan Carpenterstown
|
Please enter an Existing Valid Job Number to Reallocate this Result record