Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
18/09/2023 12:30
|
1.582917
Passed
|
0.99379
Passed
|
0.630326294
Passed
|
-20.22 - 30.72
Failed
|
Passed
|
The Keenan Carpenterstown
|
Please enter an Existing Valid Job Number to Reallocate this Result record