Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
18/09/2023 12:44
|
1.993923
Passed
|
0.98387
Passed
|
0.654806778
Passed
|
-60.09 - 50.60
Failed
|
Passed
|
The Keenan Carpenterstown
|
Please enter an Existing Valid Job Number to Reallocate this Result record