Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
19/09/2023 09:39
|
1.930104
Passed
|
0.99925
Passed
|
0.69838831
Passed
|
-60.09 - 50.60
Failed
|
Passed
|
The Keenan Carpenterstown
|
Please enter an Existing Valid Job Number to Reallocate this Result record