Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
09/10/2023 14:25
|
2.219772
Passed
|
0.99716
Passed
|
0.419733678
Failed
|
-10.47 - 10.57
Failed
|
Failed
|
Newtown Way Kill, Co Kildare
|
Please enter an Existing Valid Job Number to Reallocate this Result record