Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
29/11/2023 14:30
|
2.613437
Passed
|
0.98788
Passed
|
0.522054067
Passed
|
-20.28 - 40.96
Failed
|
Passed
|
3 Ard Sceach Coill Dubh, Kildare
|
Please enter an Existing Valid Job Number to Reallocate this Result record