Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
13/12/2023 16:35
|
2.57107
Passed
|
0.99926
Passed
|
0.521502575
Passed
|
-20.28 - 40.96
Failed
|
Passed
|
3 Ard Sceach Coill Dubh, Kildare
|
Please enter an Existing Valid Job Number to Reallocate this Result record