Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
24/01/2024 13:29 2.264011  Passed 0.99521  Passed 0.577564158  Passed -230.70 - 140.75  Failed Passed The Montpelier Carpenterstown

Please enter an Existing Valid Job Number to Reallocate this Result record