Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
24/01/2024 16:37
|
1.348409
Passed
|
0.98677
Passed
|
0.643635577
Passed
|
-40.44 - 50.66
Failed
|
Passed
|
The Montpelier Carpenterstown
|
Please enter an Existing Valid Job Number to Reallocate this Result record