Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
08/02/2024 10:38
|
2.945698
Passed
|
0.99643
Passed
|
0.403489188
Failed
|
-10.21 - 10.77
Failed
|
Failed
|
24 Potters Field Green Ardee
|
Please enter an Existing Valid Job Number to Reallocate this Result record