Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/02/2024 10:58 3.234782  Passed 0.99385  Passed 0.4582196  Failed -10.81 - 20.84  Failed Failed 25 Potters Field Green Ardee

Please enter an Existing Valid Job Number to Reallocate this Result record