Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
08/02/2024 11:55
|
3.309955
Passed
|
0.99715
Passed
|
0.451689157
Failed
|
-10.70 - 20.45
Failed
|
Failed
|
28 Potters Field Green Ardee
|
Please enter an Existing Valid Job Number to Reallocate this Result record