Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
16/02/2024 14:38 4.366717  Passed 0.9993  Passed 0.642502579  Passed -0.94 - 10.36  Failed Passed 57A Tullynagee Road, Comber

Please enter an Existing Valid Job Number to Reallocate this Result record