Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
25/04/2024 12:27 1.276554  Passed 0.98905  Passed 0.748103591  Passed -30.20 - 70.05  Failed Passed Block A Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record