Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 10:23 1.580986  Passed 0.99836  Passed 0.643292459  Passed -60.93 - 50.90  Failed Passed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record