Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 11:07 1.338441  Passed 0.99561  Passed 0.467408684  Failed -20.40 - 10.67  Failed Failed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record