Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 11:27 0.872731  Passed 0.99833  Passed 0.718209307  Passed -40.16 - 50.38  Failed Passed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record