Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 11:29 0.988816  Passed 0.99438  Passed 0.768035202  Passed -60.93 - 50.90  Failed Passed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record