Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 11:30 1.326838  Passed 0.99692  Passed 0.562453045  Passed -20.40 - 10.67  Failed Passed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record