Reallocate Job Result

Uploaded by Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
08/05/2024 11:33 1.016561  Passed 0.99652  Passed 0.537446019  Passed -10.42 - 20.08  Failed Passed Block B Nangor Mill Muileann Nangainr Clondalkin

Please enter an Existing Valid Job Number to Reallocate this Result record