Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
25/09/2024 14:42
|
6.29683
Failed
|
0.99908
Passed
|
0.565142645
Passed
|
-10.28 - 10.75
Failed
|
Failed
|
Smoke Shaft Staircore 02 Crown Square Hotel
|
Please enter an Existing Valid Job Number to Reallocate this Result record