Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
14/01/2025 13:50
|
2.550235
Passed
|
0.99973
Passed
|
0.54417396
Passed
|
-10.43 - 10.50
Failed
|
Passed
|
CONTROL BUILDING AMERICAN FRUITS AND FLAVORS IRELAND LTD ATHY
|
Please enter an Existing Valid Job Number to Reallocate this Result record