Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
04/02/2025 14:38
|
2.667532
Passed
|
0.9982
Passed
|
0.503944186
Passed
|
-10.23 - 10.50
Failed
|
Passed
|
6 Listoke Wood Ballymakenny Drogheda
|
Please enter an Existing Valid Job Number to Reallocate this Result record