Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
19/02/2025 12:29
|
7.430877
Failed
|
0.9824
Passed
|
0.598329127
Passed
|
-30.70 - 60.81
Failed
|
Failed
|
9 ANNER ROAD, DUBLIN 8
|
Please enter an Existing Valid Job Number to Reallocate this Result record