Uploaded by |
Result Date |
Permeability |
Correlation |
SlopeN |
Flow |
Overall Result |
Reallocate Result |
|
19/02/2025 16:07
|
7.566636
Failed
|
0.99681
Passed
|
0.654474486
Passed
|
-30.70 - 60.81
Failed
|
Failed
|
9 ANNER ROAD, DUBLIN 8
|
Please enter an Existing Valid Job Number to Reallocate this Result record