Job Results

Current Result Result Date Permeability Correlation SlopeN Flow Overall Result Reallocate Result
05/10/2024 07:53 8.171137  Failed 0.99676  Passed 0.586564981  Passed -160.32 - 140.96  Failed Failed Reallocate to Another Job
  04/10/2024 13:26 8.302215  Failed 0.89196  Failed 0.585664366  Passed -160.32 - 140.96  Failed Failed Reallocate to Another Job